Revitalization overview

Phase 3 projects

Fill the building.

Phase 1 and Phase 2 advance the revitalization. Phase 3 buys what patrons, renters, performers, and staff actually use: seats, access devices, house sound, lobby, concessions, and the historic neon.

The project list

These are capital-improvement planning ranges. They come from the master plan and the 15-year capital improvement plan; bids, County approval, and historic-review requirements come before work.

Mandatory for live events

House sound system

$60K-$100K

2027

Main PA, mixing console, stage monitors, amplifiers, cabling, and installation. Without it, the Fox cannot properly run concerts, theatre, civic events, or amplified rentals.

Ask about this project →

Clean slate

Auditorium seating

$97.5K-$126.75K

2027

The auditorium has no installed seating today. Phase 3 installs the house with wheelchair spaces and companion seats built into the layout.

Ask about this project →

Not optional

Captioning + listening

$15K-$25K

2027

Movie captioning, audio description, and assistive-listening equipment are legal access requirements, not amenities to add later.

Ask about this project →

First impression and flow

Lobby buildout

$40K-$65K

2027-2028

Furnishings, display cases, ticketing counter buildout, and finish work once Phase 2 leaves the lobby ready for patron use.

Ask about this project →

The margin engine

Concession stand

$85K-$130K

2028

Casework, equipment, electrical, permits, refrigeration, ice, POS, and health-department review. This is not a full commercial kitchen.

Ask about this project →

Historic review required

Historic neon marquee

$55K-$95K

2028

The marquee is historic. Before work starts, we need approval from Colorado’s State Historic Preservation Office through History Colorado. The scope includes neon work, cabinet work, structural repairs, and an electrical upgrade.

Ask about this project →

How it moves

Now-Sept. 15

Put Phase 3 in front of the County

The annual capital improvement plan is the vehicle. Every capital project still needs Commissioner approval before work begins.

Fall 2026

Start applications before money is needed

The development plan rule is six months ahead. Money needed in spring 2027 means applications and direct asks start now.

2027

Quiet launch

The 2027 package is sound, seating, access devices, and lobby work. The grand opening stays focused on thank-yous, not a new public campaign.

2028

Concessions and marquee renewal

Concessions strengthen operating margin. Renewed neon, cabinet, structural, and electrical work follows a historic-review path before any contract is signed.

The project team

Continuity into the next phase

The owner, operator, preservation partners, architect, and structural engineer continue from Phase 2 into Phase 3 planning.

  • Huerfano CountyBuilding owner
  • Spanish Peaks Community FoundationGrantee and theatre operator
  • History Colorado State Historical FundFunder
  • Colorado Preservation, Inc.State Historical Fund grant management
  • Form+Works Design GroupArchitecture
  • JVAStructural engineering

The boundary matters

Phase 3 equips the building. It is not a promise that every listed project is funded.

These are planning ranges, not bids. Each project requires funding and approvals. The reopening date depends on the complete building and operating-readiness gates, not one purchase or construction milestone.

Review Phase 2

Help place a project

Know a grantmaker, public agency, foundation, or donor who should see this? Choose a project or share this page. We can provide the scope, planning range, and documentation.