Revitalizing the Fox

Funded back to life

Built in 1917, returned to community use in the 1990s, and equipped for digital cinema in 2014, the Fox kept serving audiences while major building needs remained. A $3,264,596 Phase 2 funding package is now carrying the rehabilitation toward reopening.

The work, in order

  1. THE ASSESSMENT

    Fieldwork 2017 · final May 2018

    A 198-page building-wide diagnosis connected water, masonry, structure, access, safety, and systems into one roadmap.

    Open the assessment record →
  2. COMMUNITY DESIGN

    2018–2021

    CU Denver students developed schematic concepts; 171 community responses tested programs, spaces, and priorities.

    See the student concepts →
  1. PHASE 1 · DONE

    Complete · early 2024

    Roof, first insulation, structural stabilization, and parapet masonry.

    See the construction record →
  2. PHASE 2 · NOW

    2024–2026 · in progress

    HVAC, historic masonry, marquee canopy, drainage, fire escape, stage lighting, laser projection, abatement.

    See the current schedule →
  3. PHASE 3 · NEXT

    2027+ · target 2028

    Sound, seating, lobby, concessions, and renewed historic neon, cabinet, and electrical work.

    See the project list →

The honor roll

$3,264,596 awarded — base scope fully funded. These partners — and many individual donors — closed gaps that were real. The Fox would not be finishing Phase 2 without them.

Josie Boynton joined Spanish Peaks Community Foundation later in the capital arc and built the relationships that brought several top-tier partners to the table when it mattered most.

Public & state

Foundations & grants

Who built it

What's next

Phase 3 fills the building with what patrons and renters actually use: seating, access devices, house sound, lobby, concessions, and the historic neon marquee.